Rome CSD Capital Improvement Project Phase II
Rome CSD Phase 3 Pool Renovations
Rome CSD Capital Improvement Project
Project Name:Rome CSD Capital Improvement Projects Phase 2
Scope:Renovations throughout this school included Approx. 24,000 sqft of new ACT ceilings in the main corridors, upgrades to the vestibule entrances inclusive of new aluminum store front systems and entry sidewalks and curbs, upgrades to all the existing staircases including rubber stair treads, moisture mitigation and new finishes as well extensive roofing replacement. The main area of improvement was the Upgraded Natatorium with new translucent wall panel system, painted steel joists with color coordinated exposed ductwork, and the replacement of pool equipment. Additional work requirements also included the draining of the pool, acid washing the existing ceramic tile of the pool, removal of existing overflow drain and trench drain covers for replacement. Significant temporary pool scaffolding was installed for raised elevation work of sound proof spray foam and high performance coatings.
Approx. Contract Amount:
$2.5 Million
Completion Date:
May 2022
Architect:
LaBella Associates
Scope: General Construction Contract - Capital Improvement Project
Back